News
Lagos state government demolishes structures blocking drainages in Langbasa, Orchid Road
The Lagos State Government has demolished structures obstructing drainage systems along the Langbasa-Jehovah Witness-Ramota drainage alignment in Langbasa and on Orchid Road, both in Eti-Osa Local Government Area.
The demolition exercise was carried out by the Drainage Enforcement and Compliance Department of the Lagos State Ministry of Environment and Water Resources.
This operation is part of the state’s ongoing efforts to ensure the free flow of rainwater and reduce flooding risks in Eti-Osa and other parts of Lagos.
The update was announced by Tokunbo Wahab, Lagos State Commissioner for Environment and Water Resources, through a post on his official X (formerly Twitter) account on Thursday.
“Earlier today, the operatives of the Drainage Enforce and Compliance Department of the Ministry commenced removal of contraventions along Langbasa-Jehovah witness-Ramot Giwa drainage alignment, Langbasa, Eti-Osa LGA, and also contraventions along Orchid road,” Wahab’s post read in part.
The commissioner’s post was accompanied by two video clips showing a bulldozer tearing down structures, including perimeter fences, a standalone column, and a small building. Additionally, pictures shared in the post highlighted the aftermath of the demolition, revealing cleared areas where the contravening structures once stood.





